Outline:
- Single room (bedroom or lounge): 2–3 days total
- Open-plan living zone: 3–4 days total
- Whole house (100–150m²): 4–6 days total
- Larger period home with stairs: 6–8 days
- Water-based vs oil-based turnaround comparison
- Repairs and staining as time additions
- What you can do during each phase